Condo in Altamonte Springs, Seminole County, FL · 40 units · built 1980
Escondido at Tomoka
101-140 Tomoka Oak Blvd., Altamonte Springs, FL 32701
Overview
A 40-unit low-rise residential condominium community built in 1980, offering 2-bedroom units near the Tomoka Oaks area of Ormond Beach. The property features a swimming pool and is situated on Tomoka Oak Blvd.
Overview compiled from public sources — verify details independently.
At a glance
Facts, not verdicts- Structure
- Built 1980
- Milestone
- Not applicable
- Flood
- Being verified
- Wind
- Being verified
- Fees
- Being verified
- Reviews
- Being verified
40 residential units on record.
Is Escondido at Tomoka safe? Structure & milestone status
What are the HOA fees at Escondido at Tomoka?
Fee information for this building is being verified from public records.
What is the flood risk at Escondido at Tomoka?
Flood and wind exposure for this building are being verified from FEMA and county records.
Permits & activity
Permit activity is being compiled from the county building department index.
Get the full building report
We're compiling special-assessment history, reserve funding status, and structural-safety records for this building. Get notified when the full safety & financial report is ready.
No spam. One email when this building's report is published.
Frequently asked
Is Escondido at Tomoka safe to live in?
Aedificio doesn't grade or judge buildings. What we can tell you is factual. Applicability is a regulatory classification and does not indicate any problem. For a professional assessment, consult a licensed inspector.
What are the HOA fees at Escondido at Tomoka?
We're verifying this building's fee information from public records. Sign up above to be notified when it's published.
Does Escondido at Tomoka require a milestone inspection?
Based on available records, this building is not classified within the 3+ story milestone-inspection requirement. Verify with the association.
Can you get a mortgage on a condo here?
Condo mortgage eligibility depends on the project's "warrantability" (Fannie Mae / Freddie Mac criteria: owner-occupancy, reserves, litigation, insurance). Aedificio surfaces the public inputs; your lender makes the warrantability determination.
Is Escondido at Tomoka in a flood zone?
We're verifying this building's FEMA flood-zone designation. Sign up to be notified.